Рус / Eng

Implemented Projects

The Institute’s achievements include: participation in the design and construction of such industrial giants as the Izhorsky, Baltic and Kirov plants, Electrosila, Admiralty Shipyard, Atommash in Volgodonsk, the Shipbuilding Plant in Riga, and Belshina in Bobruisk - one of the largest tire plants in Europe today. The project count is in the thousands, and the number of industrial sectors that have achieved quantum leaps thanks to the Institute’s impressive technological advances - in the dozens.

See all objects See all objects

Moving the mark on the scale to change period

Search results:

>
>
>
- 1946
<
<
<
2021 -

Found projects: 453 Clean all filters

  1. Boiler house of Frunzensky District, Leningrad

    Period: 1970 - 1970

  2. Boiler house of the Cherepovets steel-roll plant

    Period: 1995 - 1997

  3. Boiler house of the plant named after the 2nd Pyatiletka

    Period: 1975 - 1975

  4. Boiler house of the cultural center named after the Lensovet in Leningrad

    Period: 1966 - 1967

  5. District boiler house in Pskov

    Period: 1965 - 1965

  6. Boiler house of the Pskovskaya poultry plant

    Period: 1995 - 1997

  7. Boiler house No. 6 in Vsevolozhsk

    Period: 1995 - 1997

  8. Treatment facilities of Bolshevik plant

    Period: 1960 - 1964

  9. Renovation of the Southern Water-Supply Station in St. Petersburg

    Period: 2005 - 2008

  10. Outer utility facilities of Baltika Brewery

    Period: 1995 - 1995

  11. Main water-supply facilities in Cherepovets

    Period: 1972 - 1974

  12. Industrial waste disposal station in Leningrad

    Period: 1964 - 1964


Institute projects